The Grand Opening event is just 3 weeks away, on June 15th and things are looking good. Below are some glimpses of our signature colors going up on the walls in the new Dreamclinic location in Redmond, WA.
The main guest lobby is a lovely sunlit space with splashes of blues and greens to soothe visitors.
Here is the reception area, still in progress. Plants will go atop the reception.
Here is the spring-fresh hallway showing a play of lovely soothing lavender color inside one of the massage rooms.
We look forward to creating a lovely and uplifting space for the benefit of team and patrons and will share the photos once the space is ready. In the meanwhile, please enjoy some looks of the clinic pre-remodel and during construction.
This photo shows the view of our Overlake building from Bel-Red road with our new windows signage in place. Wave when you drive by!
Here is a pre-construction view of the main hallway with treatment rooms to the right. There are 8 rooms that wiil be used for massage and acupuncture.
This is a view of the large space that will be split into guest lobby and classroom. The room features tons of natural light and tall vaulted ceiling.
The main lobby, pre-remodel, gives a hint of the beauty of the main entrance with an arched doorway.
Construction is in full swing starting April 8th. Here is a glimpse of the Breakroom area, in the back, with flooring specialists preparing the sub-floor.
To the left is what shall be transformed into two Tranquility Rooms. Say good bye to the fluorescent light fixture.