Skip to content

OverlakeFrontWindowsWe look forward to creating a lovely and uplifting space for the benefit of team and patrons and will share the photos once the space is ready.  In the meanwhile, please enjoy some looks of the clinic pre-remodel and during construction.

 

 

 

 

This photo shows the view of our Overlake building from Bel-Red road with our new windows signage in place.  Wave when you drive by!

Overlake_hallway_before

Here is a pre-construction view of the main hallway with treatment rooms to the right.  There are 8 rooms that wiil be used for massage and acupuncture.

Overlake Classsroom Before photo

This is a view of the large space that will be split into guest lobby and classroom. The room features tons of natural light and tall vaulted ceiling.

LobbyBefore
The main lobby, pre-remodel, gives a hint of the beauty of the main entrance with an arched doorway.

OverlakeBreakroomBefore

Construction is in full swing starting April 8th.  Here is a glimpse of the Breakroom area, in the back, with flooring specialists preparing the sub-floor.

TranquilityBefore

To the left is what shall be transformed into two Tranquility Rooms.  Say good bye to the fluorescent light fixture.

Dreamclinic offers convenient anytime online scheduling. Click to schedule, or call 206-267-0863.